ТСМ NC system products within commercial activities
ТСМ NC is purposed for efficiency improvement related to costs and deadlines of investment and construction projects, including the following:
Customer's opportunity to manage resources and cost in TCM NC information system during the whole period of project construction, in particular:
to get valid data required for management decisions' support on the real time basis
to form the traceable data base
to evaluate project costs with the use of the input method
to form the data required for development and adoption of the contractual strategy and localization matrix
to control project costs
Item 2.172 of the List of special products, works, and services to be used in the nuclear industry
Creation of resource-based and engineering models (REM), and resource-based project data bases related to capital construction objects. This refers to the process enabling collection and analysis of data related to all resources (considering their application technologies), which are needed to evaluate their cost.
A REM is represented by a number of human, technological, and material resources, as well as equipment and other elements related to kind and value terms, which are required for erection of buildings, facilities, and nuclear power installations in general according to an approved standard operating procedure.
A REM can be worked out for a certain project of nuclear power installation, certain nuclear buildings and facilities, certain works, and certain budget items.
While creating a REM and a resource-based data base it is necessary to carry out a quality analysis of the related consolidated cost estimate and eliminate its mistakes if any.
Arrangement of necessary information within each project stage
Application of unified requirements while monitoring of all the resources.
Application of various methods and sources of getting the input data
Information shall be available within all hierarchy stages and accessible for all project members.
Information used for means of monitoring shall be valid in its reflectance of current inventory market.
Expenses on the monitoring system shall be reasonable and justified.
The monitoring system shall contribute in actual evaluation of construction costs and making the most effective strategic management decisions on realization of the construction project
As a result, the current resource data base will be created.
Item 2.196 of the List of special products, works, and services to be used in the nuclear industry
Leave a request
Successfully
We will contact you shortly